Essential Viewing TVI C300 Guia de Instalação

Consulte online ou descarregue Guia de Instalação para Servidores Essential Viewing TVI C300. Essential Viewing TVI C300 Installation guide Manual do Utilizador

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 12
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 0
Installation Guide
Network Encoder Model TVI C300
Vista de página 0
1 2 3 4 5 6 ... 11 12

Resumo do Conteúdo

Página 1 - Installation Guide

Installation GuideNetwork Encoder Model TVI C300

Página 2 - Hardware Overview

Fault ChecklistAfter 30-90 seconds (depending on the communications device) the Network Encoder should befully powered and connected to the Network Se

Página 3 - Installing the TVI Encoder

I/O Terminal (RS485/422/Alarm/DC): Provides RS485/422 data connections, an alarm inputconnection and an additional DC power input.Figure 4: I/O Termin

Página 4

Contact DetailsFurther information on the installation and operation of the TVI C300 Encoder isavailable online at http://support.essential-viewing.co

Página 5

Installation GuideThank you for purchasing your new TVI C300 Encoder.The package you have received contains everything you need to set up an infrastru

Página 6

Installing the TVI EncoderThe TVI Encoder has been designed to be used in indoor environments (or outdoor when located ina suitable housing) and has f

Página 7

Step 1: USB PenInsert the USB Pen Drive into a spare USB socket on a PC running MS Windows XP/Vista.Depending on your computer's configuration Wi

Página 8 - Boot Process

Step 4: Encoder Name and Server AddressStep 5: Encryption and Authentication Standard LAN (RJ45) Connection The Encoder will connect to any network

Página 9

Step 6: Encoder Time ZoneStep 7: VPN Configuration Select the Time Zone on the Encoder correctly sothat the video playback time displayed in thev

Página 10 - Network Encoder Connectors

Step 8: Network Configuration (LAN only)Step 9: Mobile Network Configuration (3G only)The predefined settings are correct as of January 2009 and may b

Página 11 - RS485/422

Step 10: Eject Pen DriveOnce the appropriate settings have been entered hit the ‘Finish’ button to close the wizard. Followthe given instructions on

Página 12 - Contact Details

Once all three phases are complete the Encoder should show three solid green lights. This signifiesthat the Encoder is now connected to its Network Se

Comentários a estes Manuais

Sem comentários